BAS rough-in and raceway
Controls rough-in, pathway support, conduit coordination, and low-voltage install help for approved scope.
Owner-operated BAS install support
ArapCo Controls supports HVAC and building automation projects with clean rough-in, low-voltage controls wiring, device and panel installation, terminations, punch-list work, and dependable subcontract labor across Colorado.
Field wiring for commercial BAS devices, controllers, and equipment—installed cleanly around the project schedule.
Building automation links field sensors, controllers, HVAC equipment, and occupied spaces. ArapCo installs the physical network that allows those parts to communicate and respond as one system.
What ArapCo Supports
Use ArapCo when the project needs clean field labor, organized communication, and someone who understands the controls install lane.
Controls rough-in, pathway support, conduit coordination, and low-voltage install help for approved scope.
Control wire pulls, cable routing, labeling support, and organized terminations for BAS equipment.
Thermostats, sensors, actuators, VFD support, dampers, fans, valves, and field devices.
Control panel mounting, field wiring support, terminal work, labeling, and mechanical-room controls help.
Closeout support, corrections, cleanup tasks, small add-ons, and schedule recovery labor.
Useful for overflow work, change-order execution, select small scopes, and one-man subcontract support.
Who We Help
ArapCo fits best when the prime or controls contractor already has the design, drawings, material direction, and project scope, but needs dependable installation support in the field.
Extra hands for BAS install, terminations, device work, panels, punch list, and project overflow.
Controls-side installation support around equipment, mechanical rooms, and schedule-sensitive work.
Field support where the scope touches BAS wiring, controls devices, and equipment terminations.
A clean point of contact for subcontract labor, change-order support, and getting small controls tasks finished.
Equipment And Scope
ArapCo supports physical install work across common HVAC controls equipment, from terminal units to mechanical-room systems.
How We Work
The goal is to make the field side easier: clear scope, clear notes, clean installs, and fast paperwork.
Confirm project need, drawings, schedule, site readiness, and who approves field questions.
Clarify equipment, access, materials, reporting expectations, and documentation needed.
Show up ready, track hours and work performed, ask before assuming, and protect the schedule.
Submit clean notes, tickets, invoices, change documentation, and vendor paperwork when requested.